中外运长江有限公司工程 (071712)

 海洛斯动态    |      2012-01-01

The warehouse is used for world well-known CPU manufacturers AMD storage, and our company had completed the design and construction with good quality. Area: 900 square meters, temperature: 15 25 , humidity: 35%60%.

https://www.hirosspac.com